Close
Progress at 11-15 Grosvenor Crescent
Share your story:

The high-end residential apartments are making great progress with completion nearing and the Architect’s intent being realised.  Working closely with Main Contractor Mace and the Architect Flanagan Lawrence in the final stages, co-ordination is high to ensure the aspirations of Wainbridge are met.

Throughout the project there have been various architectural and logistical challenges due to the detail involved in such a tight space and to demanding standards, but these challenges are being overcome to bring the project to a successful close.

The stunning photos below capture the rear mews elevation with the automatic windows alongside stone and brick interfaces, the neat connection between the new and existing buildings, the level 3 terrace nearing completion, completed walk-on glass roofs and the link-bridge. All these great shots show the passion Colorminium has, to Engineer the Exceptional.