The successful installation at Phillips Auction House with McLaren Construction is ongoing and today saw the installation of the 8m high glass units to the main elevations. A double height auction space fronting Berkeley Square and Davies Street gives an impressive presence to the building.
Part of the successful installation was a partial road closure of the busy Mayfair street to facilitate the craneage.
Read more about the project in our portfolio.